首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Subsea 7 fnally confrms Angolan SLGC victory
【24h】

Subsea 7 fnally confrms Angolan SLGC victory

机译:Subsea 7终于证实了安哥拉SLGC胜利

获取原文
获取原文并翻译 | 示例
       

摘要

Subsea 7 fnally confrmed it has won the contract for Chev-ron’s long stalled Sanha Lean Gas Connection (SLGC) plat-form project off Angola. The contractor has been Chevron’s favourite for the project for more than two years but, as revealed by AOG last June, SLGC was put on hold at the last minute after years of ten-dering despite Sonamet and Subsea 7 having already been ap-proved for the shallow water development in Block 0. At that point Chevron demobilised most of the tender team and engineering frm EDG was told to store anything it had procured, despite the fact that the gas is desperately needed to keep the Angola LNG plant going.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号