首页> 外文期刊>Platt's Oilgram News >Sunken Iraqi tanker to be removed within 18 months
【24h】

Sunken Iraqi tanker to be removed within 18 months

机译:沉没的伊拉克罐车在18个月内被删除

获取原文
获取原文并翻译 | 示例
       

摘要

London—Operations to remove a sunken Iraqi oil tanker which is holding up the construction of a new Single Point Mooring (SPM) platform at Iraq’s southern export terminal in the Persian Gulf is expected take 12-18 months, a company hired to provide salvage services said Thursday The VLLC Amuriyah was sunk near Bubiyan Island off the coast of Kuwait in January 1991 during Operation Desert Storm. The wreck, which is lying at an average depth of 33 meters near the Basrah terminal, is preventing Iraq from building another floating mooring that would enable Baghdad to further raise its southern crude oil export capacity.
机译:伦敦运营拆除沉没的伊拉克油轮,该沉默的伊拉克油轮在伊拉克南部出口终端在波斯湾南部出口终端建造的建设预计将需要12-18个月,该公司聘请提供救助服务 周四表示,Vllc Amuriyah于1991年1月在Kuwait海岸的Bubiyan Island附近沉没在手术沙漠风暴期间。 沉船,躺在Basrah终端附近的平均深度33米,是防止伊拉克建立另一个浮动停泊,使得巴格达能够进一步提高其南部原油出口能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号