...
首页> 外文期刊>Applied thermal engineering: Design, processes, equipment, economics >Ash fouling monitoring and soot-blow optimization for reheater in thermal power plant
【24h】

Ash fouling monitoring and soot-blow optimization for reheater in thermal power plant

机译:热电厂中再热器的灰污染监测和烟灰吹扫优化

获取原文
获取原文并翻译 | 示例

摘要

The paper investigates a comprehensive approach for ash fouling monitoring and an optimized soot-blow mechanism for a thermal power plant reheater. A dynamic nonlinear regression model is designed to monitor the Cleanliness Factor (CF) of reheater and thereby an optimized soot-blow strategy is proposed to determine the critical CF and the duration of soot-blow cycle. The result in this case-study shows that steam consumed per soot blow cycle is reduced and also the amount of fuel used per day is saved by adopting the proposed soot-blow strategy. The proposed method can be implemented as guidance for soot-blow operation in thermal power plants without any need for additional hardware and with a minimal computation.
机译:本文调查了灰烬污染监测的综合方法,以及热电厂再热器的优化烟灰机构。 动态非线性回归模型被设计为监测再热器的清洁度因数(CF),从而提出了优化的烟灰爆发策略来确定临时CF和烟灰吹循环的持续时间。 在本案例研究中的结果表明,每烟灰吹循环消耗的蒸汽减少,并且通过采用所提出的烟灰爆炸策略,节省了每天使用的燃料量。 所提出的方法可以实现为热电厂中的烟尘吹扫操作的指导,而无需额外的硬件和最小计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号