首页> 外文期刊>日本原子力学会誌 >Feasibility study on extended operating cycle of the next generation PWR
【24h】

Feasibility study on extended operating cycle of the next generation PWR

机译:下一代PWR扩展工作周期的可行性研究

获取原文
获取原文并翻译 | 示例
       

摘要

It is expected that light water reactors (LWRs) will continue to play a dominant role in the nuclear power generation even after the change of the century. Development of future LWRs suitable for this perspective has been promoted both in Japanand in other countries. This paper focuses on the studies on feasibility of extended operating cycle of the Next Generation PWR, one of the future types of LWRs.First of all, extended operating cycles in oversea countries were studied, and then the operating cycle length suitable for Japanese plants was estimated. Overall feasibility of long operating cycles for the Next Generation PWR of 1, 700MWe level wasstudied from engineering, economic and equipment integrity standpoints in this study. As a result of the studies, the 18 and 24 month operating cycles are proved to be the desirable cycle patterns when the electric demand in Japan is taken into account.Possible economic improvement compared with the current operating cycles (of 15 months at maximum), as well as sufficient technical feasibility of the 24 month cycle, has been confirmed.This paper also points out, as a future objective, that it is desirable to develop fuels with the bornup higher than the current limit of 55 GWd/t and to raise the enrichment limit of 5%.
机译:即使在世纪变化之后,预计轻型水反应堆(LWRS)将继续在核电片发电中发挥主导作用。在其他国家的日本和日本都促进了适合这种观点的未来LWR的发展。本文重点研究了下一代PWR的延长运行周期可行性的研究,还研究了所有,海外各国的延长运营循环的未来类型之一,然后适用于日本植物的运营循环长度估计的。下一代PWR为1,700MWE水平的长期运营周期的总体可行性从工程,经济和设备诚信角度都被这项研究中的。由于研究,18和24个月的操作周期被证明是当日本的电气需求被考虑到所需的循环模式。与目前的运营周期(最大15个月为15个月),并确认了24个月周期的充分技术可行性。本文还指出,作为未来的目标,可以使用高于55 GWD / T的目前限制和提高的燃料开发燃料。富集限额为5%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号