...
首页> 外文期刊>American Machinist >GETTING THE FASTEST TOOL SETUPS POSSIBLE: LATHE PRODUCTIVITY SHOULD NOT SUFFER BECAUSE OF LONG SETUP TIMES
【24h】

GETTING THE FASTEST TOOL SETUPS POSSIBLE: LATHE PRODUCTIVITY SHOULD NOT SUFFER BECAUSE OF LONG SETUP TIMES

机译:获得最快的工具设置:由于设置时间长,车床的生产率不应受到影响

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

FOR EVERY MINUTE A SHOP SPENDS SETTING up tooling, a lathe's spindle is not working. And, when spindles are idle, shops do not make money. However, there are ways to reduce lathe-tooling-setup time. Fast tooling setups start by grouping lathe work into part families based on certain criteria. For instance, all parts that fit within the size of a 4 × 4-in. cube and require drilled holes no larger than 1.000 in. in diameter would run on a lathe tooled for those requirements. It does not matter if the parts are from different jobs or that they have different run times, as long as they meet the job criteria. The idea is to establish set arrangements on the tool disk for each part family so that time is not wasted wondering what tools will work and having to completely break down disk setups between every job.
机译:花费每分钟的时间就花费了刀具的费用,但车床的主轴却无法工作。并且,当锭子闲置时,商店不能赚钱。但是,有一些方法可以减少车床的设置时间。快速的模具设置开始于根据特定标准将车床工作分为零件族。例如,所有适合4×4英寸尺寸的零件。并要求直径不大于1.000英寸的钻孔将在满足这些要求的车床上加工。只要零件符合工作条件,零件来自不同的工作还是运行时间不同,都没关系。这样做的目的是在每个零件系列的工具盘上建立设置安排,这样就不会浪费时间在想知道哪种工具会起作用,并且必须彻底分解每个作业之间的磁盘设置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号