首页> 外文期刊>三菱重工技報 >Design and operating experience of 1000MW steam turbine for the Chugoku electric power Co., Inc, misumi No.1 unit
【24h】

Design and operating experience of 1000MW steam turbine for the Chugoku electric power Co., Inc, misumi No.1 unit

机译:设计 为 中国电力 有限公司 , 公司 , MISUMI 号机组 1000MW 汽轮机 的 操作经验

获取原文
获取原文并翻译 | 示例
           

摘要

Steam conditions for large-capacity fossil-fuel-burning thermal power plant in Japan have conventionally been24.1 MPa 538/566 deg C. Mitsubishi Heavy Industries, Ltd. (MHI)has, through wide-scale development programs, set techniques forsteam turbine design and materials at a high steam temperature andsteam conditions of 24.1 MPa and 593/593 deg C applied to large-capacity 1000 MW turbines, the Matsuura No.2 Unit for theElectric Power Development Co., Ltd. Based on our high-temperature design development, MHI has developed andmanufactured the 1000 MW turbine, Misumi No.1 Unit, forChugoku Electric Power Co., Inc., for the first time in the worldwith steam condition of 24.5 MPa and 600 deg C and a steamreheating temperature of 600 deg C. The first steam admission ofthis unit was completed in December 1997, and underwent testruns and other tests before starting commercial operation in June1998. This paper describes the design and operating features ofMisumi No.1 Unit.
机译:日本大容量化石燃料火力发电厂的蒸汽条件传统上已有24.1 MPa 538/566℃。三菱重工业,有限公司(MHI),通过广泛的开发计划,设定了汽轮机的技术 设计和材料在高蒸汽温度和24.1 MPa和593/593℃的蒸汽温度和593/593℃,施加大容量1000兆瓦型涡轮机,Matsuura No.2单位为电力开发有限公司的基于我们的高温设计 MHI,MHI开发了Andmanuffulured 1000 MW涡轮机,Misumi No.1单元,Forchugoku电力有限公司,首次在WorldWith蒸汽条件下为24.5 MPa和600°C和600℃的蒸汽料温度 。本机的第一次蒸汽入场于1997年12月完成,并在6月1998年开始商业运营之前进行了Testruns和其他测试。 本文介绍了Misumi No.1单元的设计和操作功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号