首页> 外文期刊>低温工学 >Cool-down, Static Heat Load and Warm-up Performance of the Central Solenoid Model Coil and the CentralSolenoid Insert Model Coil
【24h】

Cool-down, Static Heat Load and Warm-up Performance of the Central Solenoid Model Coil and the CentralSolenoid Insert Model Coil

机译:降温 , 静态 热负荷 和中央 电磁阀 型号 线圈和 CentralSolenoid 插入模型 线圈 的 预热性能

获取原文
获取原文并翻译 | 示例
       

摘要

In International Thermonuclear Experimental Reactor (ITER) Engineering Design Activities, the Central Solenoid Model Coil (CSMC) and the CS Insert Coil (CSIC) have been fabricated, and installed into the ITER CSMC test facility at Naka Fusion Establishment, Japan Atomic Energy Research Institute (JAERI). The CSMC and CSIC conductors are applied to the cable-ion-conduit conductors cooled by forced-flow supercritical helium (SHe) at 4.5 K. There are 48 parallel cooling channels for the CSMC, the CSIC and the structures. In the CSMC experiment, the cool-down and the warm-up were finished successfully. The cool-down time was within 480 hours. The steady head load without coil current was measured and evaluated.
机译:在国际热核实验反应器(迭代)工程设计活动中,中央电磁模型线圈(CSMC)和CS插入线圈(CSIC)已经制造,并安装在日本原子能研究所的Naka Fusion Estallment的ITER CSMC测试设施中 (jaeri)。 CSMC和CSIC导体应用于通过强制流动超临界氦(SHE)在4.5K上冷却的电缆离子导管导体。CSMC,CSIC和结构有48个平行的冷却通道。 在CSMC实验中,冷却和预热成功完成。 冷却时间在480小时内。 测量并评估没有线圈电流的稳态负载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号