This paper develops themes explained at two SAIMM platinum conferences. Optimization techniques can be used to significantly increase the value of mining businesses by enabling better long-term planning decisions. Open pit and underground mine design, mine scheduling, cut-off grade and blending, stockpiling, and the linking of these to flexible elements of the metallurgical recovery processes are all evaluated together. Transport or sale of intermediate products and the requirements of the product metal markets can also be considered. Experience shows that net present value (NPV) can be increased significantly, usually even before the expenditure of significant amounts of project capital. Recent studies of NPV have aimed to simultaneously evaluate the impact of the optimized financial solution on the non-financial features of a project or operation.The case study presented comprised a commercially orientated review of the prefeasibility study designs and cost estimates of a platinum group metal (PGM) project in South Africa, followed by value chain optimization and sustainability studies of the project carried out simultaneously to identify potential value uplifts to be gained and guide the owners' team going forward into the feasibility study phase. Some of the major aspects of the project that were found to have significant potential to add value included enhancement of the business model by the application of activity-based costing and theory of constraints, focus on the highest net value portions of the orebody in the early years of production, enhanced and optimized scheduling of the underground mining operation, application of dynamic grind and percentage mass recovery from ore to flotation concentrate (also known as percentage mass pull) to optimize revenue, application of elevated cut-off grades early in the life of mine, matching of the mining and processing capacity, expansion of the operation subject to capital availability, and installation of downstream processing facilities subject to regional third-party capacities.The investigation of non-financial project features focused on demonstrating that a financially optimized solution could also have a number of other benefits. These are mentioned briefly in the paper, which aims to present the status of the project at an early stage of its development.
机译:本文发展了两个Saimm铂金会议的主题。优化技术可用于通过实现更好的长期规划决策来显着提高采矿业务的价值。露天坑和地下矿井设计,矿井调度,截止等级和混合,储存和将这些与冶金恢复过程的柔性元件的连接全部相同。还可以考虑运输或销售中间产品和产品金属市场的要求。经验表明,净目前价值(NPV)可以显着增加,通常甚至在大量项目资本支出之前。最近对NPV的研究旨在同时评估优化的财务解决方案对项目或运营的非金融特征的影响。案例研究提出,对铂族金属的前义研究设计和成本估算的案例研究包括商业化的审查(PGM)项目在南非,随后对项目的价值链优化和可持续性研究同时进行,以确定获得潜在的价值隆起,并指导业主的团队进入可行性研究阶段。该项目的一些主要方面,这些项目被发现增加了增加价值的潜力,包括通过在基于活动的成本核算和限制理论的应用中加强业务模式,重点关注早期矿体的最高净值部分多年的生产,增强和优化的地下采矿操作调度,动态研磨和矿石百分比对浮选浓缩物(也称为百分比质量拉),以优化收入,在生命期间早期应用升高的截止等级矿井,采矿和加工能力的匹配,扩大经营所经营的资本可用性,并在区域第三方产能的情况下安装下游加工设施。非金融项目的调查专注于证明经济上优化的解决方案也可能有许多其他福利。这些文件简要介绍,旨在在其发展的早期阶段呈现项目的地位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号