首页> 外文期刊>Journal of Petroleum Science & Engineering >Novel prediction methods for under-saturated coalbed methane wells: Effect of drainage schedules
【24h】

Novel prediction methods for under-saturated coalbed methane wells: Effect of drainage schedules

机译:饱和煤层井下的新型预测方法:排水时间表的影响

获取原文
获取原文并翻译 | 示例
           

摘要

A detailed study for production prediction methods under various drainage schedules for under-saturated coalbed methane wells is performed. In terms of the relationship between the value of average reservoir pressure and the critical desorption pressure, whole production life of under-saturated coalbed methane wells is divided into two periods, and the material balance equation in each period is derived respectively. Combining the two-period material balance equation and productivity equation under pseudo-steady state, a novel production prediction method is developed. Excellent agreements between predicted water/gas production rates from the proposed method and those from numerical simulator clarify the reliability successfully. Results demonstrate that (a) matrix shrinkage effect and effective permeable capability can significantly contribute to the production rise; (b) For the drainage schedule (FWFB), with the increase of the fixed water production rate, the drainage period will shorten; (c) For the drainage schedule (RDFB), sharp decrease of formation pressure will take place.
机译:进行对饱和煤层孔的各种排水调度下生产预测方法的详细研究。就平均水库压力值与临界吸附压力之间的关系而言,饱和煤层孔的整个生产寿命分为两个时段,分别衍生各个时期的材料平衡方程。在伪稳态下组合两期材料平衡方程和生产率方程,开发了一种新的生产预测方法。从所提出的方法和数字模拟器之间的预测水/天然气生产率之间的良好协议阐明了可靠性成功。结果表明,(a)矩阵收缩效应和有效的可渗透能力可以显着促进生产升高; (b)为排水时间表(FWFB),随着固定水生产率的增加,排水期将缩短; (c)对于排水时间表(RDFB),将发生急剧的形成压力下降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号