首页> 外文期刊>Journal of Petroleum Technology >Hybrid Solution to the Grand Challenge of Developing Deepwater Stranded Gas
【24h】

Hybrid Solution to the Grand Challenge of Developing Deepwater Stranded Gas

机译:杂交解决深水滞留气体的大挑战

获取原文
获取原文并翻译 | 示例
           

摘要

While the floating liquefied-natural-gas (FLNG) option initially looked promising, high capital expenditure and very high operational expense (OPEX) have limited its potential application, with four potential FLNG projects being canceled in Australasia in the last 2 years. A new solution involving a proprietary hybrid concept has emerged to meet this challenge of developing deepwater gas fields. It is neither surface nor subsea, but the combination of both, offering fundamentally more-efficient and hence lower-cost processing.
机译:虽然浮动液化 - 天然气(FLNG)期权最初看起来有希望,高资本支出和非常高的运营费用(OPEX)有限于其潜在的应用,但在过去的2年中,四个潜在的FLNG项目被取消了澳大利亚。 已经出现了一种涉及专有的混合概念的新解决方案,以满足发展深水天然气场的这一挑战。 它既不是表面也不是海底,而是两者的结合,从根本上提供更高效,因此较低的成本处理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号