首页> 外文期刊>Journal of Mines, Metals & Fuels >Implementation of mega opencast projects in complete greenfields of Gopalpur tract of Ib valley coalfield in MCL - a success story
【24h】

Implementation of mega opencast projects in complete greenfields of Gopalpur tract of Ib valley coalfield in MCL - a success story

机译:在MCL IB Valley Coalfield Gopalpur Tract中完全绿地的兆露天项目的实施 - 成功故事

获取原文
获取原文并翻译 | 示例
       

摘要

With the proposed very fast expanding production horizon of MCL in the coming millennium and the existing mines being operated at their almost optimal level, new mega opencast projects are to be undertaken and successfully completed to fulfill the expansion programme of the organization. Some of the mega-projects are bound to be in remote greenfields and in industrially backward and inhospitable localities. Efforts and strategy required in such projects are considerably different than in the projects undertaken adjacent to the developed coalfields.In this article, the author has tries to synthesize the various procedures involved in starting a new opencast project, the constraints faced at grass root level and steps taken to overcome them.
机译:随着MCL的建议在即将到来的MCL中展开的千年发展地平线,现有的矿山在其几乎最佳的水平上运营,将进行新的Mega Opencast项目,并成功完成,以履行组织的扩张计划。 一些超级项目一定是在远程绿地和工业上落后和荒凉的地方。 此类项目所需的努力和策略比在发达的煤炭领域所采取的项目中的努力和策略不同。本文曾试图综合起始新的Opencast项目所涉及的各种程序,草根级别面临的约束 采取的步骤克服它们。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号