Application of hollow grouted anchor cable in coal roadway of compound roof

机译:中空灌浆锚索在复合屋顶煤道路中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

With the increasing scale of coal mining, the deterioration of engineering geology condition brings great difficulty to roadway support. Main return way 5104 is coal roadway of the loose and cracked compound roof in Zhaozhuang coal mine, the compound roof is difficult to control by using traditional support measures which increase the walls shrink and the floor heave and greatly affect the normal excavation and safe production, or even initiated roof fall accident. Through methods of laboratory tests and field observation, based on the analysis of mineral composition, physical mechanics parameters and development degree of joint fissures, comprehensive analysed the mechanism of the road deformation and failure; expounded the supporting mechanism of the coal roadway with compound roof by means of numerical simulation and theoretical analysis, and proposed the design scheme of combined support of anchor net beam and hollow grouting anchor cable. The industrial test showed that, it achieved the integration of anchor injection by hollow grouting anchor cable, compared to the original support, roof convergence of the roadway is reduced by 76.3%, floor heave value of the roadway is reduced by 45.5%, two nearer quantity of the roadway is reduced by 79.2%, and achieved good results.
机译:随着煤炭开采规模的增加,工程地质条件的恶化带来了巷道支撑困难。主要返回方式5104是肇庄煤矿松散和裂纹复合屋顶的煤巷,复合屋顶采用传统的支撑措施难以控制,这些措施增加墙壁缩小,地板升降,大大影响正常的挖掘和安全生产,甚至发起屋顶坠落事故。通过实验室试验和现场观测的方法,基于矿物成分的分析,物理力学参数和联合裂缝的开发程度,综合分析了道路变形和失效的机制;通过数值模拟和理论分析向复合屋顶进行了复合屋顶的支撑机制,提出了锚网梁和中空灌浆锚索组合支撑的设计方案。工业测试表明,它通过中空灌浆锚线缆达到了锚注射的整合,与原始载体相比,道路的屋顶收敛减少了76.3%,巷道的楼层升降量减少了45.5%,更接近道路数量减少了79.2%,取得了良好的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号