首页> 外文期刊>Journal of Mines, Metals & Fuels >A prognostic view on the continuous mining machine based system-reliability to augment availability of allied sub-systems
【24h】

A prognostic view on the continuous mining machine based system-reliability to augment availability of allied sub-systems

机译:基于连续采矿机的系统可靠性增加了盟军子系统可用性的预后视图

获取原文
获取原文并翻译 | 示例
           

摘要

Continuous miner (CM) is an underground coal mining machine, capable of producing coal from underground at a considerably higher rate. With incessant modernization, demand for power is increasing rapidly, which deserves a boost in coal production in India. Opencast mining in India contributes to maximum share of overall coal production as compared to underground coal mining. Opencast mining is feasible for the seams near the surface. However, with higher rate of extraction the near surface seams are getting quickly depleted, this necessitates the implementation of an effective cutting edge underground mining technology to sustain the level of coal production to support the indigenous demand of coal.Government of India has recently taken the initiative to implement cutting edge underground mining technology; such as CM and other mass production technology to boost underground mine productivity. These machines are getting implemented recently, having a broad scope of research and development in Indian as well as global mining scenario.This paper focuses on the mechanical factors contributing to equipment downtime along with statistical reliability analysis of two continuous miner machines working in two different panels of an underground mine in a leading coal producing company of the country. Reliability analysis includes statistical methods such as, trend test, serial correlation test including distribution fitting. Through trend test and serial correlation test, Time Between Failure (TBF) data is first checked whether it is free from any trend and serial correlation or not, data free from trend and serial correlation are suitable for distribution fitting. This TBF data is fed to proper probability distribution, from where the reliability curves are obtained.
机译:连续矿工(CM)是一台地下煤矿机,能够以相当更高的速度从地下生产煤炭。通过不断现代化,对权力的需求正在迅速增加,这值得在印度煤炭生产推动。与地下煤炭采矿相比,印度的露天矿业促进了整体煤炭产量的最大份额。 Opencast Mining是表面附近的接缝是可行的。然而,随着较高的提取速率,近地表接缝迅速耗尽,这需要实施有效的切削刃地下采矿技术,以维持煤炭生产水平,以支持煤炭的土着需求。最近采取了印度的土着需求。实施尖端地下采矿技术的倡议;如CM和其他批量生产技术,提升地下矿井生产力。这些机器最近正在实施,在印度和全球采矿场景中具有广泛的研发范围。这篇论文侧重于有助于设备停机的机械因素以及两种不同面板中工作两种连续矿工的统计可靠性分析该国领先煤炭生产公司的地下矿井。可靠性分析包括统计方法,如趋势试验,串联相关试验,包括分配配件。通过趋势测试和串行相关测试,首先检查故障(TBF)数据之间的时间,无论是无论如何,无论是没有趋势和串行相关,无趋势和串联相关的数据都适用于配电配​​件。该TBF数据被馈送到适当的概率分布,从获得可靠性曲线的位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号