首页> 外文期刊>BARC Newsletter >CARE AND PRECAUTION REQUIRED FOR 'WIRE' & 'WIRING' IN REACTOR CONTROL AND INSTRUMENTATION SYSTEM: EXPERIENCE FROM KAKRAPAR TO KAIGA
【24h】

CARE AND PRECAUTION REQUIRED FOR 'WIRE' & 'WIRING' IN REACTOR CONTROL AND INSTRUMENTATION SYSTEM: EXPERIENCE FROM KAKRAPAR TO KAIGA

机译:反应器控制和仪表系统中“电线”和“接线”所需的保养和预防:从KAKRAPAR到KAIGA的经验

获取原文
获取原文并翻译 | 示例
       

摘要

A salient point may be put to conclude this: "A wire which is a short circuit for LF signal may be an open circuit for HF". The PCB, mother board and design may be robustly made, but "spurious" stoppage is observed in NPP C&L Do not always blame the EC Bus board design or ECPS, but have a look at basic WIRES. Enquire if the PS wiring as implemented in NPP takes care of high speed design. Find out whether spacers are essential for FRC separation, or whether we need to braid the FRC for EMI protection ?, etc. Hence, in order to elevate plant availability due to state- of-the-art high speed C&l, look at the basic WIRES & RESPECT them; the answer may as well be there, instead of blaming Indigenous EC bus board design & ECPS. The compact reactor C&l wiring inspection does raise EMI red flag, hence some technique ought to. be sought there. Here, deviation from FRC to point-to-point I/O wiring was done without G-S-G-S concept; perhaps signal profiling there will be aberrated and will not be so EMI/EMC friendly. Hence, do give weightage to each and every wire & wiring, they are not trivial, but as important as state-of-the-art C&l. Change in mindset of using only ROUND, wire in C&l is too required to elevate plant C&l availability with state-of-the-art computer control systems.
机译:可以得出一个明显的结论:“对于LF信号而言短路的电线可能对于HF而言是开路的”。 PCB,母板和设计可能坚固耐用,但在NPP C&L中观察到“虚假”停止现象并非总是怪罪EC总线板设计或ECPS,而是要看一下基本的WIRES。查询在NPP中实现的PS布线是否照顾到高速设计。找出隔板对于FRC分离是否必不可少,或者我们是否需要编织FRC来进行EMI保护?等。因此,由于最新的高速C&l,为了提高工厂的可用性,请看一下连线并尊重它们;答案可能也在那里,而不是归咎于本地EC总线板设计和ECPS。紧凑型反应堆C&l接线检查确实会引起EMI危险信号,因此应采用某些技术。在那里寻求。在这里,从FRC到点对点I / O布线的偏差是在没有G-S-G-S概念的情况下完成的。也许那里的信号剖析会出现偏差,并且不会对EMI / EMC友好。因此,确实要权衡每条电线和布线,它们并非微不足道,而是与最新的C&l一样重要。改变了只使用ROUND的思维方式,也需要通过C&l进行布线,以通过最新的计算机控制系统提高工厂C&l的可用性。

著录项

  • 来源
    《BARC Newsletter》 |2005年第255期|共8页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 能源与动力工程;
  • 关键词

  • 入库时间 2022-08-18 09:58:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号