【24h】

Quartet wait for Tullow Jubilee decision

机译:四方等待Tullow Jubilee决定

获取原文
获取原文并翻译 | 示例
       

摘要

Tullow is sifting through bids from four contractors for a new CALM buoy as it tries to fast-track the US $600m fix to its Jubilee FPSO off Ghana. An inspection of the FPSO turret by manufacturer SOFEC back in early February uncovered a fault with the turret bearing and a temporary solution has been in place since. The FPSO will now be converted to a permanently spread moored facility, with off-take through a deepwater offloading buoy. A new anchoring system will be put in place later this year to replace the temporary tugs and a second phase will involve rotating the FPSO in the first half of next year.
机译:塔洛(Tullow)正在筛选来自四个承包商的新的CALM浮标,因为它试图快速追踪加纳外的Jubilee FPSO的6亿美元修理费。早在2月初,制造商SOFEC对FPSO刀塔进行了检查,发现刀塔轴承有故障,此后便已找到临时解决方案。 FPSO现在将转换为永久性散布的停泊设施,并通过深水卸载浮标进行取水。一个新的锚固系统将在今年晚些时候到位,以代替临时拖船,第二阶段将涉及在明年上半年旋转FPSO。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号