The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company of Australian incorporated, PanAust Limited. Production commenced at Phu Kham in 2008. Since the second half of 2016, there has been a significant increase in ore hardness and this has negatively impacted the PKM concentrator and resulted in lower SAG mill throughput rates. Over the remaining life of mine, the changing ore body and increase in ore hardness is forecast to continue as the pit deepens and the availability of softer blending ores reduce. To manage this risk, PKM initiated a Hard Ores Management Program to determine the most effective way to improve the mill throughput of harder ores. This involved conducting a number of innovative and process control driven blasting trials to optimize run-of-mine (ROM) fragmentation and other blasting outcomes. From 2016 to 2017, the performance of high powder factor blasting, electronic detonators and fast timing, high velocity of detonation (VOD) explosives, double-priming, and deck blasting, were individually and systematically assessed. The success of each blasting trial was then based on a 'value for money' criteria. This criteria is a cost / benefit analysis that weighed-up the additional cost to implement the trial against the measured improvement in mill throughput. Electronic and high VOD 90:10 emulsion:ANFO blasts were determined to have the best value for money, achieving an increase in mill throughput of 54% compared to baseline. This article discusses how the implementation of an innovative and process control driven blasting trial methodology was able to successfully manage the hard ore challenges at PKM. In addition, this success was achieved without any major cost implications, safety incidents or process plant setbacks.
机译:Phu Kham铜金运营(PKM)是位于老挝北部的大型露天矿。它是由Phu Bia Mining Limited(PBM)为澳大利亚澳大利亚的老挝注册子公司(PBM)的开发和运营。生产于2008年在Phu Kham开始。自2016年下半年以来,矿石硬度显着增加,这对PKM集中器产生了负面影响,并导致落下轧机吞吐量较低。在我的剩余寿命中,预测矿石的变化矿体和矿石硬度的增加将继续随着坑加深并且更柔软的混合矿石的可用性减少。为了管理这一风险,PKM发起了一个硬矿石管理计划,以确定提高磨机吞吐量的最有效方法。这涉及进行许多创新和过程控制驱动的爆破试验,以优化矿山的碎片和其他爆破结果。从2016到2017年,单独和系统地评估高粉末因子爆破,电子雷管和快速时序,高速爆炸(VOD)爆炸,双灌注和甲板爆破的性能。然后,每个爆破审判的成功基于“金钱的价值”标准。该标准是一种成本/效益分析,称重额外成本,以实现磨机吞吐量的测量改进。电子和高vod 90:10乳液:确定ANFO BLASTS与基线相比,造成54%的轧机产量增加54%的爆炸。本文讨论了如何实现创新和过程控制驱动的爆破试验方法的实施方式能够在PKM成功管理硬矿挑战。此外,在没有任何重大成本影响,安全事故或过程植物挫折的情况下取得了这一成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号