首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Ophir test cuts Equatorial Guinea FLNG costs
【24h】

Ophir test cuts Equatorial Guinea FLNG costs

机译:Ophir测试削减了赤道几内亚的FLNG成本

获取原文
获取原文并翻译 | 示例
       

摘要

Ophir is expecting to reduce wells and costs for its FLNG project off Equatorial Guinea after a successful drill stem test, with the vessel contract to be awarded before the end of the year. The operator has completed a drill stem on the Fortuna-2 well, the first test on the discoveries on Block R, and believes it was capable of producing up to 180 MMcf/d.
机译:在成功进行了钻杆测试之后,Ophir预计将减少赤道几内亚外FLNG项目的油井和成本,并在今年年底之前授予船舶合同。操作员已经完成了对Fortuna-2井的钻探,这是对R区块发现的首次测试,并认为该钻探器的产能最高可达180 MMcf / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号