...
首页> 外文期刊>Journal of Failure Analysis and Prevention >Local Dent Behavior of Directional Crossing Pipeline Caused by the Boulder in Stratum
【24h】

Local Dent Behavior of Directional Crossing Pipeline Caused by the Boulder in Stratum

机译:岩石中巨石引起的定向交叉管道的局部凹痕行为

获取原文
获取原文并翻译 | 示例
           

摘要

Dent of crossing pipeline caused by the boulder in the stratum may result in pipeline premature failure. Dent process of the crossing pipeline was investigated. Effects of boulder load, pipeline pressure and diameter-to-thickness ratio on the dent behavior were discussed. The results show that dent deformation process of non-pressure pipeline consists of five phases, while the process of pressure pipeline consists of eight phases. When the boulder load increases, plastic deformation increases and a dent with ship shape appears on the pipeline. Dent rate, dent depth and length increase when the diameter-to-thickness ratio increases. With the increasing internal pressure, dent rate of the pipeline decreases, but rebound rate increases. Axial length of the dent for pressure pipeline is smaller than non-pressure pipeline.
机译:由地层中的巨石引起的交叉管道的凹陷可能导致管道过早失效。 研究了交叉管道的凹痕过程。 讨论了巨石负荷,管道压力和直径与厚度比对凹陷行为的影响。 结果表明,非压力管道的凹痕变形过程由五个阶段组成,而压力管线的过程由八个阶段组成。 当巨石负载增加时,塑料变形增加,管道上出现船舶形状的凹痕。 当直径到厚度的比率增加时,凹陷率,凹痕深度和长度增加。 随着内部压力的增加,管道的凹痕率降低,但篮板率增加。 压力管线的凹痕的轴向长度小于非压力管线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号