In 1997, VAI and Sollac developed a unique cost-effective solution to revamp the No. 2 twin-strand slab caster at Sollac Fos sur Mer from a curved mold to a vertical mold with bending with the shortest possible shutdown time and maximized utilization of existing equipment. Consequently, investment costs were kept 50 to 70 percent below those for conventional conversion solutions. Sollac now successfully produces more than two million tonnes per year on the modernized twin-strand slab caster since its start-up on Nov. 11, 1998. After only a nine-day shutdown, the caster was up to normal production within five days, and the quality results are excellent.The No. 2 single-strand slab caster at LTV Steel, Indiana Harbor Works was revamped from a curved to a straight mold in less than seven days and started up on April 30, 2000. His exceptionally short outage time could only have been achieved by applying the patented VAI/Sollac concept. Nominal production was reached three days after start-up.
机译:1997年,奥钢联和Sollac开发了一种独特的经济高效的解决方案,将Sollac Fos sur Mer的2号双钢坯板坯连铸机从弯曲的模具改造为带有弯曲的立式模具,并以最短的停机时间实现了最大程度的利用设备。因此,投资成本比传统的转换解决方案低了50%至70%。自1998年11月11日投产以来,Sollac现在成功地用现代化的双股板坯连铸机成功生产了超过200万吨的年。仅停产9天后,连铸机在5天内就达到了正常生产,印第安纳州港口工程公司LTV Steel的2号单钢坯板坯连铸机在不到7天的时间内就从弯曲的模具改造为直的模具,并于2000年4月30日投入生产。只有采用获得专利的VAI / Sollac概念才能实现时间。启动后三天就达到了名义生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号