首页> 外文期刊>AISE Steel Technology >Successful reline and start-up of E blast furnace
【24h】

Successful reline and start-up of E blast furnace

机译:E高炉的成功改造和启动

获取原文
获取原文并翻译 | 示例
           

摘要

Major items that contributed to success of the E furnace reline project were:1. Development of a well researched and accurate base reline scope.2. Enhancement and capital upgrade selections based on detailed studies.3. Careful selection of experienced engineering and construction contractors.4. Involvement of experienced operating, maintenance, engineering, legal and utilities personnel throughout the reline project.5. Strict control of reline scope to ensure minimal cost-related changes.6. Positive synergy developed through a cooperative and focused effort by the reline team, contractor (KM/KJ), and Stelco divisional and works management groups.Significant technology and equipment enhancements reflect Stelco's commitment to upgrade its facilities to world class standards. Facility and technological upgrades will increase furnace life beyond previous record campaigns.The E furnace facility, with capital upgrades, is now in a position to fulfill Stelco's strategic plan to enhance operating performance by increasing productivity, improving quality and lowering costs.
机译:E炉改造项目成功的主要因素有:1。开发一个经过充分研究和准确的基准线范围2。基于详细研究的增强和资本升级选择3。精心选择经验丰富的工程和建筑承包商4。在整个改造项目中涉及经验丰富的操作,维护,工程,法律和公用事业人员5。严格控制生产线范围,以确保将与成本相关的更改降到最低。6。维修团队,承包商(KM / KJ)以及Stelco部门和工程管理团队的合作和专注的努力产生了积极的协同作用。重要的技术和设备改进反映了Stelco致力于将其设施升级到世界一流标准的承诺。设施和技术升级将延长熔炉寿命,超越以往的纪录。E熔炉设施进行了资本升级,现已能够满足Stelco的战略计划,即通过提高生产率,提高质量和降低成本来提高运营绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号