Noble drives down completion time for Tamar 8 well by adopting new designs for temporary P&A, BHAs

机译:通过采用临时P&A,BHAS的新设计,诺布尔推动了Tamar 8的完成时间

获取原文
获取原文并翻译 | 示例
           

摘要

SINCE NOBLE ENERGY'S TAMAR FIELD offshore Israel was brought online in 2013, the natural gas produced from the field has provided 60% of Israel's electricity. To continue meeting the country's gas demand, Noble announced in 2016 that it would drill the Tamar 8 well. This provided Noble with an opportunity to optimize the well's completion design and methodology. In a presentation on 6 March at the 2018 IADC/SPE Drilling Conference in Fort Worth, Texas, Ian Magin, Deepwater Completions Engineer for Noble, said that the operator made key changes on Tamar 8, including drilling and underreaming on the same trip and developing a new plan for temporary plug-and-abandonment (P&A) between drilling and completing the well.
机译:由于诺布尔能源的巨野地区海上以色列于2013年在线上网,该领域生产的天然气提供了60%的以色列的电力。 继续满足该国的天然气需求,2016年贵族宣布它会钻取巨人8井。 这提供了贵族,有机会优化井的完成设计和方法。 在2018年3月6日的德克萨斯州德克萨斯州IADC / SPE钻井会议上的演讲中,深水完成工程师为高尚的工程师表示,操作员对巨蜥8的关键变化,包括在同一旅行和发展中钻探和爆发 钻井和完成井之间的临时插头放弃(P&A)的新计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号