首页> 外文期刊>Hydrocarbon Processing >Develop more efficient capital projects with an EPC 4.0 strategy
【24h】

Develop more efficient capital projects with an EPC 4.0 strategy

机译:使用EPC 4.0策略开发更高效的资本项目

获取原文
获取原文并翻译 | 示例
       

摘要

Digital technologies are being widely adopted across nearly every industry Industrial companies are moving as far away as possible from manual,document-centric processes and replacing them with cloud services,digital solutions and data-centric strategies.As a result,the manufacturing industry has almost doubled its productivity over the last 20 yr.This has not translated to the process industry,where digital technologies have not been adopted to the same extent.In a capital project execution phase,manual and document-centric processes are still preferred on both the engineering,procurement and construction(EPC)and owner side,and productivity has flat-lined.In a document-centric system,information is shared by passing paper,PDF or Excel documents between teams,departments,clients and suppliers.This type of manual information transfer carries a large risk for error as documents are passed from one person to another.It is also an inefficient process,with engineers spending 50% of their time looking for and validating information,ultimately leading to misguided decision-making,low transparency and the constant need to translate data.While engineering makes up only 10% of the capital project cost,engineering errors propagate throughout the procurement and construction phase,resulting in material waste,rework and delays.The cost of engineering errors alone comprises 14% of the total project cost and can cause significant schedule delays.
机译:数字技术在几乎所有行业工业公司都广泛采用,尽可能远离手动,以文档为中心的流程,并用云服务,数字解决方案和数据为中心的策略替换它们。结果,制造业几乎在过去的20年里,它的生产力增加了一倍。这尚未翻译成流程行业,其中数字技术尚未采用相同的程度。在资本项目执行阶段,手动和以文档为中心的工艺在工程方面仍然优选,采购和施工(EPC)和所有者方面,生产力平衡。在以文档为中心的系统,通过在团队,部门,客户和供应商之间传递纸张,PDF或Excel文档来共享信息。本类型的手动信息转移带有很大的错误风险,因为文件从一个人传递给另一个人。它也是一个低效的过程,工程师花费了50%的TI我正在寻找和验证信息,最终导致误导的决策,低透明度和持续需要翻译数据。当工程占资本项目成本的10%,工程误差在整个采购和施工阶段传播,导致材料浪费,返工和延误。单独的工程误差成本包括14%的项目总成本,可能导致大量的进度延误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号