首页> 外文期刊>Hydrocarbon Processing >Coke drum and blowdown system overpressure protection design-Part 1
【24h】

Coke drum and blowdown system overpressure protection design-Part 1

机译:焦炭鼓和排污系统过压保护设计 - 第1部分

获取原文
获取原文并翻译 | 示例
           

摘要

The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs. Having two overpressure protection devices in series imposes some challenges in the design. The aim of this article is to identify the main characteristics and difficulties for designing CD and BD relief systems for this configuration. Part 1 provides details on different destinations for CD relief, identification of the main relief contingencies involved in the design and PRV set pressure definition, sizing and selection. Part 2, to be published in the May issue of Hydrocarbon Processing, will detail the critical elements and key considerations in the BD and flare hydraulics.
机译:延迟焦化单元(DCU)中的排污(BD)系统(DCU)接收在焦炭鼓(CD)衰减过程中产生的废物流以回收有价值的碳氢化合物和水。 在最近的DCU设计中,CD压力释放阀(PRV)还通过BD PRVS向该系统排放到闪光系统。 具有串联的两个过压保护装置在设计中施加了一些挑战。 本文的目的是确定为此配置设计CD和BD浮雕系统的主要特点和困难。 第1部分提供了有关CD救济的不同目的地的详细信息,识别设计和PRV设置压力定义,调整和选择所涉及的主要救济突发。 第2部分,在可能发表的烃处理中发表,将详细介绍BD和闪光液压的关键要素和关键考虑因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号