...
首页> 外文期刊>Hydrocarbon Processing >Coke drum and blowdown system overpressure protection design-Part 2
【24h】

Coke drum and blowdown system overpressure protection design-Part 2

机译:焦炭鼓和排污系统过压保护设计 - 第2部分

获取原文
获取原文并翻译 | 示例
           

摘要

The blowdown(BD)system in delayed coking units(DCUs)receives waste streams generated during the coke drum(CD)decoking process to recover valuable hydrocarbons and water.In recent DCU designs,the CD pressure-relief valves(PRVs)also discharge to this system and then to the flare system via the BD PRVs.Having two overpressure protection devices in series imposes some challenges in the design.The aim of this article is to identify the main characteristics and difficulties for designing CD and BD relief systems for this configuration.Part 1,published in the April issue of Hydrocarbon Processing,provided details on different destinations for CD relief;identification of the main relief contingencies involved in the design;and PRV set pressure definition,sizing and selection.The following will detail the critical elements and key considerations in the BD system and flare hydraulics.
机译:延迟焦化单元(DCU)中的排污(BD)系统(DCU)接收焦炭鼓(CD)拆除过程中产生的废物流,以回收有价值的碳氢化合物和水。最近的DCU设计,CD压力 - 浮雕阀(PRV)也排出 该系统通过BD PRVS到爆发系统。串联的两种过压保护装置在设计中施加了一些挑战。本文的目的是确定为此配置设计CD和BD浮雕系统的主要特点和困难 .Part 1,发表于4月份的碳氢化合物处理,提供了关于CD救济的不同目的地的详细信息;识别设计中涉及的主要救济突发事件;和PRV设置压力定义,调整和选择。以下将详细说明关键元素 并在BD系统中的关键考虑和光晕液压。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号