首页> 外文期刊>Health & safety at work >Answers on a postcard
【24h】

Answers on a postcard

机译:在明信片上的答案

获取原文
获取原文并翻译 | 示例
           

摘要

Can the review's scope be widened? The Department for Communities and Local Government (DCLG) has suggested that the review will focus on requirements for buildings over 18m, which the RIBA, representing architects, fears is inadequate. Its president, Jane Duncan, has said: "It is essential that the review enables a comprehensive, transparent and fundamental reappraisal of Approved Document B (AD B) in its entirety... anything less risks missing potential gaps in our Building Regulations that urgently need to be addressed." Then there are the pieces of the legislative and contractual jigsaw linked to regulations. Architect Paul Bussey, lead for CDM, fire and access at Allford Hall Monaghan Morris, says: "There's a wider picture and endemic problems that we need to grasp. There are issues about building control, forms of contract, and client responsibilities for health and safety design."
机译:审查的范围可以扩大吗? 社区和地方政府部(DCLG)建议审查将侧重于1800万超过1800万元的要求,其中riba代表建筑师,恐惧是不充分的。 Jane Duncan曾表示:“审查至关重要的是,审查的全面,透明和基本的重新评估到批准的文件B(AD B)全部内容......迫切地,任何可能在建筑法规中缺失潜在差距的任何风险 需要得到解决。“ 然后有与法规相关的立法和合同拼图。 Allford Hall Monaghan Morris的CDM,火灾和途中提供了CDM,火灾和通道,我们需要掌握更广泛的画面和流行问题。建筑控制,合同形式以及健康的客户责任有问题。 安全设计。“

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号