Fueling fracturing with natural gas: Redefining wellsite power for oilfield services

机译:用天然气促进压裂:重新定义油田服务的井三角

获取原文
获取原文并翻译 | 示例
           

摘要

On Aug.24,2017,Hurricane Harvey was barreling toward the middle of the Texas Gulf Coast shoreline,packing winds up to 145 mph and reports of anticipated rainfall in excess of 36 in.As the storm loomed closer to making landfall,the team at Evolution Well Services was busy evaluating the best plan of action-Harvey's projected path was headed directly for one of their newly deployed fleets of electric power generation and fracturing equipment in the Eagle Ford shale.The personnel decision was an easy one;people on location quickly battened down the hatches and promptly evacuated to safety for an undetermined amount of time,not knowing what the severity,length or aftermath of the storm would be.The newly minted equipment,however,still gleaming with its fresh coat of silver-fleck paint,was not going to be so lucky.The decision was made-the fleet was going to ride out the storm where it stood.Two days after Harvey had passed,the crew was re-deployed to the wellsite.What they found was incredible;no notable damage to any of the equipment.The team spent the day completing safety checks,ensuring that all systems were”go”for resuming fracturing operations later that night.The natural gas line was opened,feeding the custom turbine generator,and momentarily after that,electricity was flowing out to the pump trailers,blender,and ancillary equipment on location.Pumping operations resumed,and business as usual commenced,Fig 1.
机译:2004年8月24日,Hurricane Harvey朝着德克萨斯州墨西哥湾沿岸海岸线的中间,装满了145英里/小时的装箱,并报告了预期的降雨量超过36英寸.As暴风雨覆盖着较近的人,团队进化井服务正忙着评估行动的最佳计划 - 哈维的预计路径是直接前往他们在Eagle Ford页岩的新部署的电力发电和压裂设备中的一个。人员决定是一个容易的人;人们在位置很容易在舱口下击打舱口,并迅速地疏散安全的时间不确定,不知道风暴的严重程度,长度或后果是什么。然而,新铸造的设备仍然闪烁着它的新鲜的银色斑纹油漆,不会那么幸运。作出的决定 - 舰队将乘坐它的风暴。在哈维过去了的时候,船员重新部署到Wellsite。他们发现了什么IBLE;任何设备都没有受到显着的损坏。该团队在完成安全检查的情况下花费了一天,确保所有系统在那天晚些时候恢复断裂操作。天然气管线打开,喂养定制涡轮发电机,喂养定制涡轮发电机暂时之后,电力流出到泵拖车,搅拌机和辅助设备上的位置.Pumping操作恢复,以及通常的业务开始,而是开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号