...
首页> 外文期刊>World Oil >Doing more with less:A framework for effective equipment integrity assurance
【24h】

Doing more with less:A framework for effective equipment integrity assurance

机译:更少做更多:有效设备完整性保证的框架

获取原文
获取原文并翻译 | 示例
           

摘要

Operators have been forced to make staffing cuts and postpone any non-urgent work until it can be completed without risking the health of their workforce.Looking ahead however,there is a need for essential drilling activity to continue to maintain current levels of production and meet future demand.With operators in survival mode,now more than ever they require innovative solutions and approaches to achieve desired results within tighter margins.According to Rystad Energy,global oil and gas capital budgets could be slashed even further by $100 billion during 2020,a number that could rise to $150 billion if low oil prices persist into 2021.Worryingly,recent data suggests this has increased risk.Lloyd's Register recently surveyed operators responsible for well integrity assurance and found that as many as 35% admitted that their wells delivery process was ineffective at reliably managing risk and preventing failures.
机译:经营者被迫使削减和推迟任何非紧急工作,直到它可以完成而不冒着劳动力的健康。然而,未来,需要基本的钻井活动继续保持当前的生产水平和会面 未来的需求。在生存模式中的运营商,他们需要创新的解决方案和方法,以实现更严格的边距内所需的结果。根据Rystad能源,全球石油和煤气资本预算可能在2020年期间进一步削减了1000亿美元。 如果低油价持续到2021美元,则可能上升到1500亿美元的数字。近期数据表明,这一数据增加了风险.Loyd的登记册最近调查的运营商负责诚信保证,发现其井交付过程有多达35%的经营者负责 无效地在可靠地管理风险和防止失败。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号