...
首页> 外文期刊>Ti02 Worldwide Update >MADAGASCAR: DFS Shows $US 116 mn for Road, Bridge & Port Infrastructure
【24h】

MADAGASCAR: DFS Shows $US 116 mn for Road, Bridge & Port Infrastructure

机译:马达加斯加:DFS为道路,桥接和港口基础设施显示1美元116 MN

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This design approach combines two traditional separation stages into a single stage, which reduces the pumping requirement and the plant footprint, with capital and operating cost savings. Twin-start Minerals Technologies VHG spirals will be used for the final upgrading stage of very high grade "clean" feed (now containing 90% heavy minerals). The flowsheet design also includes a constant density surge tank, so as to provide a 60-minute buffer between the dozer mining unit and the wet concentrator.
机译:这种设计方法将两个传统的分离阶段结合在一个阶段,这减少了泵送要求和工厂足迹,具有资本和运营成本。 双启动矿物技术VHG螺旋将用于非常高等级“清洁”饲料的最终升级阶段(现在含有90%的重型矿物质)。 流动设计还包括恒定的密度电涌罐,以便在装饰机组和湿浓缩器之间提供60分钟的缓冲液。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号