...
首页> 外文期刊>The Australian pipeliner >MPC Kinetic provides fixed supply of water for Broken Hill
【24h】

MPC Kinetic provides fixed supply of water for Broken Hill

机译:MPC Kinetic为破碎的山提供了固定的水供应

获取原文
获取原文并翻译 | 示例
           

摘要

Developed by WaterNSW, the $467 million Wentworth to Broken Hill Pipeline (W2BH) project was designed to drought-proof one of New South Wales' iconic mining towns, which for decades has been hit by crippling drought and often left struggling with critically low water supplies. The successful build was completed by MPC Kinetic and joint venture partner John Holland ahead of schedule and in an industry-record time of just 10 months.
机译:由Waternsw开发的,4.67亿美元的温特沃斯(Wayworth)为破碎的山路(W2BH)项目旨在防止南威尔士州标志性的矿业城镇,这是几十年来遭受了瘫痪的干旱,经常留下批评性低供水的努力 。 成功的建设由MPC动力学和合资伙伴John Holland提前提前,行业记录时间仅为10个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号