首页> 外文期刊>Progress in Artificial Intelligence >Another Link in the Chain: Archaeometallurgical Investigation of an Anchor Chain from the Nineteenth Century Akko Tower Shipwreck
【24h】

Another Link in the Chain: Archaeometallurgical Investigation of an Anchor Chain from the Nineteenth Century Akko Tower Shipwreck

机译:链条中的另一个链接:来自十九世纪的锚链的锚固链Akko Tower Shipwreck

获取原文
获取原文并翻译 | 示例
           

摘要

In the 2016 excavation season of the Akko Tower shipwreck, a ferrous stud-link anchor chain and a rod, both covered with thick encrustation and concretion, were retrieved from the site. The chain links, studs, and rod were analyzed by metallurgical methods, including: radiographic testing, x-ray fluorescence, light microscopy, scanning electron microscopy with energy-dispersive spectroscopy, optical emission spectroscopy, and microhardness measurements, in order to determine their composition and microstructure. The links and the rod were made of wrought iron, while the studs were made of gray cast iron with a significant silicon content of 2 wt.%. The welding zone of the links was identified. The chain was end-welded by forge welding, and the stud was fixed mechanically. The design and manufacturing characteristics of the chain are typical of nineteenth century stud-link anchor chain, which supports the dating of the ship. It is suggested that the chain served the secondary anchor of the ship.
机译:在Akko Tower Fackwreck的2016次挖掘季节,从网站上检索覆盖的铁螺柱链路锚链和杆,覆盖的覆盖物。通过冶金方法分析链节,螺柱和棒,包括:射线照相检测,X射线荧光,光学显微镜,扫描电子显微镜,具有能量分散光谱,光学发射光谱和微硬度测量,以便确定它们的组成和微观结构。连杆和杆由锻铁制成,而螺柱由灰铸铁制成,具有2重量%的显着硅含量。%。鉴定了链路的焊接区。通过锻造焊接将链焊接,螺柱机械固定。链条的设计和制造特性是十九世纪螺柱链路锚链的典型,支持船的约会。建议将链服务于船的二次锚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号