Critical Investigation into the Drilling and Blasting Work done at the 'Mormont' Quarry in Order to Reduce Blast Vibrations

机译:对“莫蒙特”采石场进行的钻孔和爆破工作进行的重要调查,目的是减少爆破振动

获取原文
获取原文并翻译 | 示例

摘要

Holcim Eclepens produces about 650,000 tons of cement per year. To supply the plant with sufficient raw material in 2005 about 670,000 tons of limestone were extracted at the ,,Mormont" quarry by drilling and blasting. About 200,000 t were mined at the "Marniere" marl quarry by using an excavator. Since many years Eclepens, a village nearby the "Mormont" quarry, has been complaining about ongoing blast vibrations. Therefore, Holcim guaranteed to keep the future blast vibrations below 3mm/s, which was distinctly below the legal limit. In 2005 Holcim decided to increase the raw material extraction by 30 percent. As the people of Eclepens feared an increase of blast vibrations, too Holcim set up the working pro-gram "concept carriere 2005" to analyze critically the future impact of that extraction increase. Today, after more than 160 production blasts, only three single blasts exceeded the 3 mm/s limit. The majority of the blast vibrations are distinctly below 2 mm/s.
机译:Holcim Eclepens每年生产约65万吨水泥。为了给工厂提供足够的原料,2005年,在“ Mormont”采石场通过钻孔和爆破开采了约67万吨石灰石,在“ Marniere”泥石采石场使用挖掘机开采了约20万吨。 ,位于“ Mormont”采石场附近的一个村庄,一直抱怨爆炸持续不断,因此,霍尔奇保证将未来的爆炸振动保持在3mm / s以下,这明显低于法律规定的极限。2005年,霍尔奇决定增加原料由于埃克莱彭斯人担心爆炸振动会增加,霍奇姆也建立了工作程序“ concept carriere 2005”,以严格分析该萃取物对未来的影响,如今,经过160多次生产爆炸,只有3次单次爆炸超过3 mm / s的限制,大多数爆炸振动明显低于2 mm / s。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号