...
首页> 外文期刊>Corrosion & Materials >APOLOGY AND RETRACTION FROM MR GERRY PORE TO MR IAN GLOVER AND CORROTEK CONSULTANTS PTY LTD
【24h】

APOLOGY AND RETRACTION FROM MR GERRY PORE TO MR IAN GLOVER AND CORROTEK CONSULTANTS PTY LTD

机译:从Gerry Pore先生到IAN GLOVER和CORROTEK顾问PTY LTD的致歉和退回

获取原文
获取原文并翻译 | 示例
           

摘要

I, Gerry Pore wish to state the following with respect to Corrotek Consultants Pty Ltd and Mr Glover, who have my article "A Time and a Place" as sent by email from Novacoat on 13 November 2001 to members of the Zinc Rich Coatings Council.1. My statement "after the enforced dismissal of the client's Consultant" is not correct. The "Consultant" referred to has informed me that there is a Sub-Consultancy Agreement in place with Sinclair Knight Merz to provide ongoing consultancy services with respect to coatings issues associated with the West Angelas Project.2. My statement that the Consultant (Corrotek), was dismissed because of their "obstinate and obstructive" resistance to the request of a contractor engaged in the West Angelas Project for a change from WB-IZS to SB-IZS is not correct. I am now aware that Corrotek advised SKM that such a change could be permitted subject to stringent conditions.
机译:我是格里·波尔(Gerry Pore),谨就Corrotek Consultants Pty Ltd和格洛弗先生的陈述如下:我的文章“时间与地点”是2001年11月13日由Novacoat通过电子邮件发送给富锌涂料委员会成员的。 1。我的说法“在强制解雇客户顾问之后”是不正确的。提到的“顾问”告诉我,与辛克莱·奈特·梅尔兹(Sinclair Knight Merz)签订了一项子顾问协议,以就与西安吉拉斯项目有关的涂料问题提供持续的咨询服务。2。我关于顾问(Corrotek)被解雇的说法是不正确的,因为他们对参与西安吉拉斯项目的承包商提出的从WB-IZS更改为SB-IZS的请求“顽固而阻碍”抵抗。我现在知道,Corrotek建议SKM在严格条件下允许进行此类更改。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号