Industrial electron accelerators developed at the Budker Institute of Nuclear Physics, SB RAS

机译:在Budker核物理研究所,SB RAS开发的工业电子加速器

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In the early 1960s, work on developing industrial high-power electron accelerators was initiated by Academician G I Budker, the founder and director of the Institute of Nuclear Physics (currently, Budker Institute of Nuclear Physics, BINP). This review describes the arrangements and principles of operation of high-power electron accelerators of the ELV and ILU series designed and constructed at the BINP. Since 1972, 170 ELV and more than 50 ILU machines have been shipped to many countries around the world, most of them still operational. International Atomic Energy Agency surveys rate the BINP as one of the few well-trusted global suppliers of reliable industrial accelerators.
机译:在20世纪60年代初,由院士兼核物理研究所的创始人和主任(目前,Budker核物理学研究所,BINP学院)发起了开发工业高电站电子加速器的工作。 该综述描述了在BINP中设计和构造的ELV和ILU系列的高功率电子加速器的操作的安排和原理。 自1972年以来,170埃尔夫和50多台ILU机器已经向全球许多国家运送到世界各国,其中大多数仍然运作。 国际原子能机构调查率为宾珀作为可靠的工业加速器的少数可信赖的全球供应商之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号