...
首页> 外文期刊>PACE: Process & Control Engineering >CSG: Young dogs and old tricks - The technical standard for coal seam gas needs to be set
【24h】

CSG: Young dogs and old tricks - The technical standard for coal seam gas needs to be set

机译:CSG:年轻的狗和旧技巧 - 需要设定煤层气的技术标准

获取原文
获取原文并翻译 | 示例

摘要

MANY have been questioning the pace at which energy giants seem to be rushing to get gas out of the ground. There may be public misconceptions about the industry particularly surrounding access to the abundant resource, but there's 'also some concern with the gas extraction methods. This aside, Australian companies mostly apply world class practices where the practice has been refined over many years. However, with CSG, this is not necessarily the case and in fact a different economic and technical model is mostly required before the project is viable. Scaling any system whether it includes technology, business processes or resource management requires careful operational consideration and generally a lot of trialling. It may have worked for the initial production, but will it work for full production? Even if we think we have the solution, you can be assured you will still be modifying and adapting to the new scale to maintain your position as a low cost producer.
机译:许多人已经质疑能量巨头似乎急于赶出地面的速度。 可能存在对该行业的公众误解,特别是对丰富资源的访问,但也有燃气提取方法的一些担忧。 除此之外,澳大利亚公司主要申请世界级练习,在多年来的实践中已被提炼。 但是,对于CSG,这不一定是案例,实际上,在项目可行之前主要需要不同的经济和技术模式。 缩放任何系统是否包括技术,业务流程或资源管理需要仔细的操作考虑,并且通常很多试验。 它可能已为初始生产工作,但它将适用于全部生产? 即使我们认为我们有解决方案,您也可以放心,您仍然可以修改和适应新的规模,以将您的位置保持为低成本生产商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号