...
首页> 外文期刊>Steel & Metallurgy >Modern Blast Furnace Design
【24h】

Modern Blast Furnace Design

机译:现代高炉设计

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Blast furnace operations have developed towards higher levels of pulverized coal injection and have to operate on lower quality raw materials and more frequent fluctuations in production levels. These operating conditions introduce increased loadings to the blast furnace lining. These loadings include thermal, mechanical and chemical components. Modern blast furnaces should be able to cope with these increasing demands. The target campaign life of new designs is over 20 years at an availability of over 95%. This can only be achieved if the internal profile of the blastfurnace is maintained during the campaign as any degradation will immediately have a negative effect on process stability and campaign life.
机译:高炉操作已经发展到更高水平的粉煤喷射,并且必须在较低质量的原材料上运行,并且在生产水平中更频繁地波动。 这些操作条件将增加的载荷引入高炉衬里。 这些负载包括热,机械和化学成分。 现代高炉应该能够应对这些不断增长的需求。 新设计的目标竞选寿命超过20年,可用超过95%。 只有在广告系列期间维持BlastFurnace的内部轮廓,因为任何退化都会立即对过程稳定和竞选生活产生负面影响,因此只能实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号