...
首页> 外文期刊>Oil review Africa >G E executes PIP upgrade at plant's two gas turbines
【24h】

G E executes PIP upgrade at plant's two gas turbines

机译:G e在植物的两个燃气轮机上执行PIP升级

获取原文
获取原文并翻译 | 示例
           

摘要

GE POWER AND Indorama Eleme Petrochemicals Limited (IEPL) have successfully executed GE's 6B performance improvement package (PIP) upgrade on the first two out of six 6B gas turbines at the petrochemical facility in Eleme, Rivers State, Nigeria. The upgrade increased Indorama's plant output by 15 per cent per gas turbine, more than doubling the expected increase of six per cent. The upgrade will help extend the interval for combustion and hot gas path inspections, reducing overall maintenance costs. In addition, this project is expected to increase power plant availability of up to 3,960 hours over 16 years.
机译:GE Power和Indorama Eleme Petrochemicals Limited(IEPL)已成功执行GE的6B燃气轮机在尼日利亚石油化工厂的前两种中的六6B燃气轮机的升级。 升级升级增加了每种燃气轮机15%的植物产量,超过预期增加六个%。 升级将有助于扩展燃烧和热气路径检查的间隔,降低整体维护成本。 此外,该项目预计将增加高达3,960小时的电厂可用性超过16年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号