...
首页> 外文期刊>Resources policy >Real option valuation of an Indian iron ore deposit through system dynamics model
【24h】

Real option valuation of an Indian iron ore deposit through system dynamics model

机译:通过系统动力学模型的印度铁矿石存放的实际选择估值

获取原文
获取原文并翻译 | 示例

摘要

The values of the mine planning parameters are changed dynamically over the life of mine. These values are not exactly known at the time of preparation of long-term mine plan and valuation of the mine. Hence, future values of these parameters are to be forecasted which results in the uncertainties of parameter estimation. Uncertainties in parameter set thus become a grave concern to a mine planner. The conventional deterministic NPV method fails to provide the desired solution in many situations as it captures neither the uncertainties nor the dynamic nature of the parameters. Realizing the above facts, few researchers approached the problem using stochastic NPV method of evaluation. They mainly considered price and metal uncertainties in the development of stochastic evaluation models. Real Option Valuation (ROV) is a much more pragmatic approach to solve this problem. By exercising different options such as continue, deferral, expand and shutdown optimally, the ROV approach adds more value to a project. In addition, when the ROV is integrated with System Dynamics Model (SDM) for simulation of various stochastic planning parameters, it strengthens the method of project valuation. In the present study, metal price, capital and operating costs, and other relevant planning parameters are simulated in SDM platform along with ore reserve by conditional simulations for evaluation of an iron ore project. The study results indicate that the ROV method yields 10% higher NPV than the NPV obtained in the stochastic NPV method for this specific case study mine.
机译:矿山规划参数的值在我的寿命上动态改变。这些值在准备长期矿山计划和矿井估值时不确定。因此,应预测这些参数的未来值,这导致参数估计的不确定性。参数集中的不确定性因其对矿山策划者的严重关切。传统的确定性NPV方法不能在许多情况下提供所需的解决方案,因为它既不捕获不确定性也不捕获参数的动态性质。实现上述事实,很少有研究人员使用随机NPV评估方法进行了问题。他们主要认为随机评估模型的发展中的价格和金属不确定性。真实的选择估值(ROV)是一种更加务实的方法来解决这个问题。通过锻炼不同的选择,例如继续,延迟,展开和关闭,ROV方法为项目增加了更多价值。此外,当ROV与系统动力学模型(SDM)集成时,用于模拟各种随机规划参数,它加强了项目估值的方法。在本研究中,在SDM平台中模拟了金属价格,资本和运营成本以及其他相关规划参数以及通过条件模拟进行矿石储备,用于评估铁矿石项目。研究结果表明,ROV方法的NPV比在该具体案例研究矿的随机NPV方法中获得的NPV高出10%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号