...
首页> 外文期刊>NGW's Gas Market Reconnaissance >Public Service Electric & Gas has asked New Jersey regulators for permission to add 14 pipelines to its grid system as a safeguard against possible problems with interstate shipments of natural gas.
【24h】

Public Service Electric & Gas has asked New Jersey regulators for permission to add 14 pipelines to its grid system as a safeguard against possible problems with interstate shipments of natural gas.

机译:公共服务电气和天然气已要求新泽西州监管机构允许将14个管道添加到其网格系统中,以防止天然气的州际货物出货量可能存在的问题。

获取原文
获取原文并翻译 | 示例

摘要

PSE&G said the plan is part of its pending $2.5 billion Energy Strong II program.Of that figure about $863 million would be for the new gas pipelines. The state's Division of Rate Counsel is arguing that the project should be rejected, saying it will have a major impact on utility rates if the plan is approved as proposed. Rate Counsel Director Stefanie Brand said, “We just don’t think we need to do this. The contingency that they are trying to protect against has never happened. It just doesn’t feel like a wise investment for the state or ratepayer.’’
机译:PSE&G表示,该计划是其待办事项25亿美元的能源强大II计划的一部分,该数字约为8.63亿美元,是新的煤气管道。 国家的利率律师司就是争论该项目应该被拒绝,说如果计划被批准就提议批准,这将对效用率产生重大影响。 利率律师总监Stefanie品牌说:“我们只是认为我们不需要这样做。 他们试图防止反对的应急从未发生过。 它只是对州或比赛者的聪明投资。“

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号