...
首页> 外文期刊>NGW's Gas Market Reconnaissance >Cameron LNG is taking in small amounts of natural gas as the US Army Corps of Engineers continues working to reopen the Calcasieu Channel to deep draft vessel traffic following siltation by Hurricane Laura in August
【24h】

Cameron LNG is taking in small amounts of natural gas as the US Army Corps of Engineers continues working to reopen the Calcasieu Channel to deep draft vessel traffic following siltation by Hurricane Laura in August

机译:由于美国陆军的工程师继续努力将Calcasieu频道持续到8月份苏拉飓风·劳拉飓风·劳拉的淤积渠道进展到深度船只交通,以少量天然气占据少量天然气。

获取原文
获取原文并翻译 | 示例
           

摘要

The Corps of Engineers expects to have the ship channel dredged and open to the Gulf of Mexico by Oct. 8.
机译:12月8日,工程师的工程兵团预计将让船舶通道向墨西哥湾开放。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号