首页> 外文期刊>Natural Hazards >Residents' satisfaction to post-Wenchuan earthquake recovery and reconstruction
【24h】

Residents' satisfaction to post-Wenchuan earthquake recovery and reconstruction

机译:居民对汶川后地震恢复和重建的满意度

获取原文
获取原文并翻译 | 示例
       

摘要

"People first" is one of the guiding principle of post-earthquake recovery and reconstruction (PERR) in China. Residents' satisfaction should be one of the objects of PERR. The article examines the satisfaction level of residents in Lushan county of Sichuan Province, an area stricken both by the Wenchuan Ms8.0 earthquake in 2008 and the Lushan Ms7.0 earthquake in 2013. Census data and factor analysis were used for analysis. Based on the result of data analysis, eight factors are selected to indicate residents' satisfaction: the relation of resident, infrastructure and employment, social security, the effect of disaster mitigation, natural environment, social affair, owner-occupied housing, price of commodities. Based on result of this study, some recommendations are put forward.
机译:“人民第一”是中国地震后恢复和重建(PERR)的指导原则之一。 居民的满意应应该是彼得的物品之一。 本文探讨了四川庐山县居民居民的满意度,由2008年的汶川MS8.0地震和2013年庐山MS7.0地震。人口普查数据和因子分析用于分析。 基于数据分析的结果,选择了八个因素,表明居民的满意度:居民,基础设施和就业,社会保障,灾害减缓,自然环境,社会事务,商品价格占用的效果的关系。 。 根据本研究的结果,提出了一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号