首页> 外文期刊>Natural Gas Week. >Permian Producers’Gas Still Stranded By South-of-the-Border Pipeline Delays
【24h】

Permian Producers’Gas Still Stranded By South-of-the-Border Pipeline Delays

机译:二叠纪生产者仍然被南方的边境管道延误搁浅

获取原文
获取原文并翻译 | 示例
           

摘要

A key frustration of Permian Basin producers desperate to ship gas out of the region is that ample pipeline takeaway capacity already exists to handle the glut-it just has nowhere to deliver the gas. Pipes might be able to deliver more than 4 billion cubic feet of gas per day to the Mexican border,but only 0.5 Bcf/d is making it across.And it's not clear if that volume will grow later this summer,in the fall,or sometime next year when Permian supplies are likely to be even more abundant.Nobody can say when Mexico will deliver the promised market for the Permian's wealth of oil-associated gas because the bottlenecks stalling the Mexican receipt projects can be intractable- especially holdups stemming from disputes with indigenous groups who hold even more say under the administration of leftist President Andres Manuel Lopez Obrador.To put this situation in perspective,the Permian region is now expecting the first real slug of takeaway capacity in Octo- ber,when Kinder Morgan is scheduled to start service on the 2 Bcf/d GulfCoast Express Pipeline(NGW Apr.29'19).But by then,more than triple that capacity would be on line if receipt pipelines in central Mexico had progressed as Sener,the Mexico state energy utility,had planned.
机译:二叠系盆地生产者的关键挫折绝望地送出该地区的气体是,丰富的管道外卖能力已经存在,以处理污水 - 它只是提供气体。管道可能能够每天向墨西哥边境提供超过40亿立方英尺的煤气,但只有0.5 bcf / d正在跨越。并不清楚这个卷在今年夏天晚些时候在秋季成长,或者明年的某个时候,当墨西哥将为墨西哥收入项目的瓶颈提供墨西哥收据项目的瓶颈,墨西哥队将提供墨西哥收据项目的瓶颈可能会难以解决墨西哥收据的承诺市场与土着群体在左派·曼努埃尔·洛佩兹奥比尔·洛佩兹议会下持有甚至更多地发言。为了使这种情况以透视,二叠纪地区目前正在期待八十八甲板的第一个真正的外卖能力,当时摩根计划在2 BCF / D Gulfcoast Expressineline上开始服务(NGW APR.29'19)。但是,如果墨西哥中部的收据管道进展为参赛者何墨西哥国家能源效用,已计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号