...
首页> 外文期刊>Natural Gas Week. >Cameron Train 3 Producing
【24h】

Cameron Train 3 Producing

机译:卡梅隆火车3生产

获取原文
获取原文并翻译 | 示例
           

摘要

The final train at Cameron LNG's three-train export terminal in Hackberry,Louisiana,is producing LNG and is expected to enter commercial service in the third quarter.Feed gas was introduced in April.The Sempra LNG-operated project has a nameplate production capacity of 12 million tons/yr (1.6 billion cubic feet per day).Commercial operations of Train 1 and Train 2 started in August 2019 and February 2020,respectively.The next phase includes trains 4 and 5,but a final investment decision (FID)has not been made.That expansion would add 1.4 Bcf/d of export capacity and take five years to complete.
机译:Cameron Lng的三列火车出口终端在汉克布兰,路易斯安那州的最终火车正在生产LOG,并预计将在第三季进入商业服务。4月份eed Gas。Sempra Lng操作项目具有铭牌生产能力 1200万吨/年(每天16亿立方英尺)。火车1和火车2分别于2019年8月和2020年开始的火车1和火车2。下一阶段包括火车4和5,但最终的投资决策(FID) 未制作。这一扩张将增加1.4 BCF / D的出口能力,需要五年才能完成。

著录项

  • 来源
    《Natural Gas Week.》 |2020年第21期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号