【24h】

Federal - Mining

机译:联邦矿业

获取原文
获取原文并翻译 | 示例
           

摘要

On March 7, 2018, on a party-line vote, the House Committee on Natural Resources approved House Bill 520, which would allow mining projects that will provide "strategic and critical minerals" to be considered "infrastructure projects" entitled to expedited permitting under Executive Order No. 13,807, 82 Fed. Reg. 40,463 (Aug. 15, 2017). See H.R. 520, 115th Cong, (as reported by H. Comm. on Natural Res., Apr. 11,2018). Under the bill, called the "National Strategic and Critical Minerals Production Act," a 30-month time limit would be placed on permit review, including compliance with the National Environmental Policy Act. Additionally, projects on National Forest System lands would be exempt from regulations prohibiting tree cutting and road construction in roadless areas. The bill is similar to legislation that has been passed by the House during the last three Congresses but has consistently failed to advance in the Senate.
机译:2018年3月7日,在派对投票上,自然资源批准的房屋委员会批准的房屋票据520,这将允许将提供“战略和关键矿物质”的采矿项目被认为是“基础设施项目”,以便有权加快允许的“基础设施项目” 喂养No.13,807,82的行政命令。 reg。 40,463(2017年8月15日)。 见H.R. 520,115th Cong(如H. Comm报道。在天然Res上,4月11,2018)。 根据该法案,称为“国家战略和批判性矿产行为”,将在许可证审查中举办30个月的时间限制,包括遵守国家环境政策法。 此外,国家森林制度土地的项目将免除禁止无路区域的树木切割和道路建设的法规。 该法案类似于在最后三次国会期间通过房屋通过的立法,但在参议院始终未能进入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号