首页> 外文期刊>Foster Natural Gas Report >Magellan Midstream and Navigator Energy Announce Open Season for Cushing-to-Houston Oil Pipeline
【24h】

Magellan Midstream and Navigator Energy Announce Open Season for Cushing-to-Houston Oil Pipeline

机译:Magellan中游和导航能源宣布靠山休斯顿油管道的开放季节

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Magellan Midstream Partners, LP and Navigator Energy Services announced November 5, that they are conducting an open season to jointly assess customer interest to transport various grades of light crude oil and condensate from Cushing, Oklahoma to Houston, Texas. The open season closes on Jan. 31, 2019, at 12:00 p.m. (CT). The proposed Voyager pipeline system is expected to have an initial capacity of at least 250,000 b/d, with the ability to expand further if warranted by industry demand, and is planned to be operational by the end of 2020.
机译:Magellan Midstream Partners,LP和Navigator Energy Services于11月5日宣布,他们正在开放季节,共同评估客户兴趣,以将各种级别的轻质原油和凝结物从库欣到休斯顿运输到休斯顿,德克萨斯州。 开放季节于2019年1月31日凌晨12点关闭。 (CT)。 建议的航程管道系统预计将具有至少250,000个B / D的初始能力,如果由行业需求保证,则进一步扩展,并计划在2020年底之前进行运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号