...
首页> 外文期刊>Foster Natural Gas Report >Liquids Shippers Cite 'Atypical' Elements in Sunoco Pipeline’s Declaratory Order Petition to FERC With Regard to Delaware Basin Extension And Reference to a Future Project
【24h】

Liquids Shippers Cite 'Atypical' Elements in Sunoco Pipeline’s Declaratory Order Petition to FERC With Regard to Delaware Basin Extension And Reference to a Future Project

机译:液体托运人在Sunoco Pipeline的宣言宣言请愿书中引用了“非典型”元素,以便于特拉华州拓纳推广,并参考未来项目

获取原文
获取原文并翻译 | 示例
           

摘要

On March 23 the Liquids Shippers Group filed a protest and comments with FERC, raising questions with regard to a 2/23/15 petition for declaratory order (PDO) that Sunoco Pipeline, LP (OR15-18) submitted to the Commission as a prerequisite for its Delaware Basin Extension project. Sunoco is seeking approval of the proposed tariff rate structure, proration policy, and various described aspects of the Transportation Service Agreement (TSA) that would govern service. The Liquids Shippers noted at the outset that Sunoco’s petition contained a description of its open season for the project, but it did not include the open season documents, including the TSA and proposed prorationing policy, “which are the foundation for the approvals sought by Sunoco.”
机译:3月23日,液体托运人集团向FERC提出了抗议和评论,提出了关于宣言订单的2/23/15申请(PDO)的问题,即Sunoco Pipeline,LP(OR15-18)作为先决条件提交给委员会 为其特拉华河流域扩展项目。 Sunoco正在寻求批准拟议的关税率结构,普遍存在政策和各种描述的交通服务协议(TSA)的各个方面,该协议(TSA)是管理服务的。 Sunoco的请愿书的一开始就指出了该项目的开放季节的一开始,但它不包括开放季节文件,包括TSA和拟议的普选政策,“这是Sunoco寻求的批准的基础 。“

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号