首页> 外文期刊>Foster Natural Gas Report >Shippers Recite List of Questionable Conclusions Espoused in FERC's Opinion on Initial Decision Addressing the Market Power of ANR Storage; Presiding Judge Blasts Commission's 'Mistake' In Allowing a Procedurally Tainted Outcome That Could Have Implication for Both Gas and Electric Case Hearings
【24h】

Shippers Recite List of Questionable Conclusions Espoused in FERC's Opinion on Initial Decision Addressing the Market Power of ANR Storage; Presiding Judge Blasts Commission's 'Mistake' In Allowing a Procedurally Tainted Outcome That Could Have Implication for Both Gas and Electric Case Hearings

机译:托运人背诵在FERC关于初步决策中支持的可疑结论列表,讨论了ANR存储市场的市场力量; 主导法官爆炸委员会的“错误”允许程序污染的结果可能对气体和电动案件听证有所暗示

获取原文
获取原文并翻译 | 示例
       

摘要

The Canadian Association of Petroleum Producers (CAPP), Northern States Power Co.-Minnesota and Northern States Power Co.-Wisconsin (jointly, NSP), Tenaska Gas Storage, LLC, and BP Canada Energy Marketing Corp., -- collectively, the Joint Intervenor Group (JIG) - requested clarification and rehearing of the Commission's order on Initial Decision ((D) (Opinion No. 538) issued 10/15/15 with regard to the disposition of the market-based rate flexibility sought by ANR Storage Co. (ANRS) (RP12-479). Opinion 538 concerned ANR S'’s request for a declaratory order granting authorization to charge market-based rates for natural gas storage service. (ANR Storage also submitted a petition for rehearing of Opinion 538. Its petition, dated 11/13/15, will be reviewed in next week's published FR, which will be issued on Wednesday, before Thanksgiving Day.)
机译:加拿大石油生产商协会(CAPP),北方州电力公司 - 明尼苏达州和北方州电力有限公司(联合,NSP),泰斯卡瓦储存,LLC和BP加拿大能源营销公司, - 集体 联合终止组(JIG) - 要求委员会在初步决定上澄清和重新入学((d)(意见第538号)10/15/15关于ANR存储所寻求的市场速率灵活性的处置 Co.(ANRS)(RP12-479)。意见538有关ANR S'申请授予授权授权,以向市场为基于市场的天然气储存服务税率。(ANR存储还提交了一个征求意见的请愿书538 。它的请愿书11/13/15,将于下周发布的FR审查,该FR将于周三发布,在感恩节那天之前。)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号