New Problem: Electric Motor Blowing Overloads

机译:新问题:电动机吹过过载

获取原文
获取原文并翻译 | 示例
           

摘要

WE WERE CALLED out to trouble shoot a problem on a heat-treating system's hydraulic unit in which the electric motor was reading twice the nameplate amperage and causing the overloads to fail. The customer had the motor checked out by a reliable motor-repair house and they felt the problem was with the hydraulic system. The system had an overhead vertically mounted cylinder with the rod end attached to a large basket. The rod would extend lowering the basket into the hot quenching fluid, where it would sit for hours and then would be raised to the unloading position by retracting the cylinder. When we arrived, we found the that the overload problem would happen every so often when the cylinder was lowered by the weight of the basket pulling on the rod. When the machine would cycle normally, our amp meter never exceeded the maximum nameplate amp rating of 20 amp, but when the problem popped up, the amps would exceed 108 inrush and drop to 40 amps and trip the overloads all within 1 to 2 seconds. We could not find any mechanical malfunctions, so it had to be a hydraulic problem.
机译:我们被要求在热处理系统的液压装置上射击射击一个问题,其中电动机读数铭牌热量两倍,并使过载失败。客户让电机由可靠的电动机维修房屋检查,他们认为问题是液压系统。该系统具有顶置垂直安装的圆筒,杆端连接到大篮子。杆将延伸将篮子降低到热淬火流体中,在那里它将通过缩回圆筒来静置数小时,然后将通过缩回汽缸升至卸载位置。当我们到达时,我们发现当圆筒被拉上杆上的篮子的重量降低时,每种情况都会发生过载问题。当机器将正常循环时,我们的放大器仪表从未超过20AMP的最大铭牌AMP等级,但是当问题弹出时,AMPS将超过108个浪涌和下降到40安培,并在1到2秒内跳闸。我们找不到任何机械故障,所以它必须是一个液压问题。

著录项

  • 来源
    《Fluid Power Journal》 |2020年第9期|共1页
  • 作者

    Robert Sheaf;

  • 作者单位

    CFPAI/AJPP CFPE CFPS CFPECS CFPMT CFPMIP CFPMMH CFPMIH CFPMM CFC Industrial Training;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 一般性问题;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号