首页> 外文期刊>Geoscience journal >Mechanism of the dynamic pressure caused by the instability of upper chamber coal pillars in Shendong coalfield, China
【24h】

Mechanism of the dynamic pressure caused by the instability of upper chamber coal pillars in Shendong coalfield, China

机译:中国神社煤田上室煤柱不稳定引起的动力压力机制

获取原文
获取原文并翻译 | 示例
           

摘要

In Shendong coalfield, severe support failure accidents caused by the dynamic pressure occurred frequently when longwall faces extracting the lower coal seam progress below the chamber coal pillars. These incidents largely threaten the personnel safety and regular operations. The rationale of the dynamic pressure has been investigated based on the movement law of the overlying strata. Experimental and numerical simulations of a longwall face in Shigetai coal mine agree well with the qualitative explanations. It is shown that the failure of the chamber coal pillars causes the sudden break and even rotation of the key strata, thereby leading to strong dynamic load that crushes the supports in the longwall face. Several guidelines have been proposed to prevent the occurrence of the dynamic pressure, the capability of which has been demonstrated by in situ practice in two longwall faces in Shendong coalfield.
机译:在Shendong煤域,当长墙面面向腔煤柱下方的煤层煤层进展时,由于长壁面的较低的煤层进展而发生严重的支撑失效事故。 这些事件在很大程度上威胁着人员安全和常规行动。 基于覆盖层的运动规律研究了动态压力的基本原理。 石格塔伊煤矿长墙脸的实验和数值模拟与定性解释一致。 结果表明,腔室煤柱的失效导致突然断裂甚至键旋转关键地层,从而导致强大的动态载荷,以压碎长壁面中的支撑件。 已经提出了一些指导方针来防止动态压力发生,其能力在Shendong煤田的两个长墙面上展示了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号