首页> 外文期刊>Erdol Erdgas Kohle >Total Starts Up Production of Egina Field
【24h】

Total Starts Up Production of Egina Field

机译:总共启动Egina领域的生产

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Total has started up production end of December 2018 from the Egina field,located in around 1,600 m of water depths,150 km off the coast of Nigeria.At plateau,the Egina field will produce 200,000 boepd,which represents about 10% of Nigeria's production.The Floating Production Storage and Offloading(FPSO)unit used to develop the giant Egina field is the largest one Total has ever built.This project has also involved a record level of local contractors.Six of the eighteen modules on the FPSO were built and integrated locally,and 77% of hours spent on the project were worked locally.Startup has been achieved close to 10% below the initial budget,which represents more than 1 billion $ of CAPEX savings,due in particular to excellent drilling performance where the drilling time per well has been reduced by 30%.
机译:总共启动了2018年12月底,从Egina领域开始,位于约1,600米米的水深,距离尼日利亚海岸150千米。高原,Egina领域将产生20万台展位,占尼日利亚生产的约10% 。浮动生产储存和卸载(FPSO)用于开发巨型EGINA字段的单位是完全构建的最大。这项项目还涉及本地承包商的记录水平。FPSO上的十八个模块的创建和 本地集成,在项目上花费的77%的小时在本地工作.StartUp已经取得了接近初始预算的10%,其占钻井的优秀钻井性能,达到了10亿美元。 每井的时间已减少30%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号