Failure analysis on premature fracture of boric acid recycle pump shaft in 1000 MW nuclear power plant

机译:1000兆瓦核电站硼酸回收泵轴过早断裂的失效分析

获取原文
获取原文并翻译 | 示例
           

摘要

Boric acid recycling pump is used to maintain the circulation of boric acid solution for the need of nuclear safety protection. In a boric acid recycling pump, the pump shaft is an important com- ponent. As it is exposed to relatively harsh work environment, the pump shaft may encounter severe failures. In this paper, premature fracture of the pump shaft, happened after the pump serving only one year in a 1000 MW nuclear power plant, was carefully investigated. In order to find out the root cause of the failure, material identification, metallographic inspection, me- chanical property test, wear and fractographic observation, micro-zone analysis and mechanism analysis were carried out. The obtained results indicated that triple stress concentration, caused by the small transition arc radius, surface defects and the aggregation of inclusions, was the primary reason. It resulted in the nucleation and coalescence of micro-cracks and consequently lead to the premature fracture. Countermeasures were then put forward to solve corresponding problems.
机译:硼酸回收泵用于维持硼酸溶液的循环,需要核安全保护。在硼酸回收泵中,泵轴是一个重要的组件。由于它暴露于相对苛刻的工作环境,泵轴可能会遇到严重的故障。在本文中,泵轴的过早骨折,在1000兆瓦核电站仅在1000兆瓦核电站服务的泵后发生,经过仔细研究。为了找出失败的根本原因,材料识别,金相检测,ME- Chanical Properical试验,磨损和地形观察,进行了微区分析和机制分析。所获得的结果表明,由小过渡弧半径,表面缺陷和夹杂物聚集引起的三重胁迫浓度是主要原因。它导致微裂纹的成核和聚结,从而导致过早的骨折。然后提出对策以解决相应的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号